Services

When Communities Succeed,

We Succeed.

Products

Housing

Products

Community Buildings

Services

Funding

Turnkey Housing

Your complete solution for hassle-free turnkey homes.

Products & New Build Services

Production Pre-Fabrication Workflow

PRELIMINARY VIABILITY STAGE

Phase 1

Funding Sources

1 - 2 Weeks

Preliminary Stage

  • Client reviews/Accepts project budget and engineered design proposal

  • Client signs a Bison Modular Homes building contract

  • Deposit required 

Phase 2

Manufacturing

1 - 2 Weeks

Active Project Stage

  • Building Construction 
  • Frame Construction 
  • Floor, Walls, and Roof 
  • Plumbing, water systems and electrical wiring 
  • Doors and windows 
  • Interior finishes 


Preparation for delivery:

  • Furniture
  • Appliances 


Site development:

  • Septic tanks and wells
  • Gravel Pads
  • Driveways 

Phase 3

Shipping

1 - 2 Weeks

Delivery Stage

  • Transportation, Setup, and Final Touches 


On-Site Final Connections:

  • Connection to the sewage system 
  • Heating 
  • Air conditioning 
  • Ventilation 
  • Utility/mechanical hookups, etc. 


On-Site Final Steps
(options include):

  • Decks 
  • Hydro 

Ask an Expert,